Development of common sampling strategy

The survey study on the users requirements resulted in a decision on the water parameters to be monitored during the 2nd PMC meeting. The set of the parameters to be monitored includes:
 
  • Temperature
  • pH
  • Conductivity
  • Hardness
  • Nitrates (NO3)
  • Nitrites (NO2)
  • Total coliforms
  • Feacal coliforms
  • Feacal streptococci
  • E. coli